Framer on Lot 99 installing walls. 3 framers on Lot 97- rolling trusses 1 framer snapping Lot 6 and 7 Lawler install gas 10 2 plumbers lot 96 (electrical out of wall) 2 plumbers lot 95 2 plumbers Lot 94 1 framer lot 93 bracing walls 2 lathers lot 22 1 fire sprinkler installer needs glasses 1 plumber filling up Lot 16 2 plumbers installing tubs lot 22.