Lot 687-framers are doing pick up framing on second floor all window Guard rails are in everyone wearing the proper PPE everything\'s looking good. Lot 702 excavators are backfilling utilities all spoil piles are the correct distance from trench everything looks good. Lot 690 excavators finishing up rock in the crawlspace everyone wearing proper PPE everything was good. Lot 691 framers are finishing up framing on first floor everyone wearing the correct PPE everything was good. Lot 692 no activity today waiting for insulation to pass inspection before hanging drywall everything was good. Lot 693 landscapers working on landscaping they are wearing the proper PPE everything looks good. No activity on the interior of home today. Lot 694 Masons are doing masonry on exterior of home they are wearing the correct PPE landscapers are also finishing spreading dust in the backyard everything was good. Lot 676 no activity on interior of home today waiting for cabinet guys to install cabinets tomorrow everything looks good. Lot 677 painters doing final paint touch up on interior and exterior of home they have correct height of ladders for the task at hand everything was good. Lot 679 no activity on interior of home today roofers are starting to roof the home ladder is set at a 41 angle and 3 foot above roofline everything was good. Lot 680 no activity on the interior or exterior of home waiting for insulators to start insulating of window guard rails are installed everything looks good.