Lot 139_Envision Flooring working on tile and hard surfaces. All PPE is good to go. Lot 139_(superior carpentry) working on day one of Miller install all PPE is good to go lot 278_fence installers working on gates and pick up Work all PPE is good to go Lot 273 Westside Drywall doing mud and tape All PPE is good to go Lot 279_Sunlight Electric working on finishing trim out all PPE is good to go Lot 280_ I, construction, installing mirrors and bath accessories, all PPE is good to go Lot 281_ Zweigart Siding working on exterior siding and trim, talk to Arturo about one pump jack being at a level, nobody was working on it, He will get it fixed before work starts again. Lot 270_Plumber\'s roughing in and HVAC roughing in, All PPE is good to go Lot 269_Zweigart siding installing building wrap. All PPE is good to go. Lot 268_framers just finished first floor floor sheeting and about to start first floor walls. All PPE is good to go.