Lots 215 through 218 framers are in there doing touchup stuff from the frame punch all proper PPE is accounted for Lots 214 through 211 foundation rebar is capped Excavation being performed at lots 214 through 211 and there is no trenches greater than 4 feet. Workers are staying out of the trench due to water buildup. 219 through 222 no workers 223 through 226 framers have not started the roof so there\'s no overhead issues and their is barriers preventing fall in the front and back of the houses Lots 191 through 194. There are painters and drywall and cabinet touchup workers in there. Everyone staying safe and proper PPE is being worn. Lots 148 through 150 are in final trims and final punch. No workers are in there but us.