Lot 139 and 278_Ashland landscaping install installing grass bark and plants. All PPE is good to go. Lot 278_ flooring installing tile inside the home all PPE is good to go Lot 277 and 276_ Ashland landscaping set irrigation and landscaping. All PPE is good to go. Lot 275_ flooring installing hardwood flooring in LVT all PPE is good to go. Also tablesaw does have the proper guards and electrical is grounded properly. Lot 274 Westside drywall install installing texture. All PPE is good to go. Lot 281_Westside insulation installing walls and floor insulation All PPE is good to go Lot 282 Westside Drywall hanging drywall, all PPE is good to go Lot 283_framers working on roof sheeting, we are missing temp rails in the windows, missing safety rails at stairs, spoke with Serge. He\'s going to get those on by the end of the day. Lot 284_framers working on roof pack to get ready for Trusses, missing safety rail at stairs inside spoke with Serge. He will have those on by the end of the day. Lot 270 Sider working on installing exterior siding, spoke to the foreman about pump jacks being crooked and need to be straightened out. All PPE is good to go. Lot 270_ Electric finishing up elec. rough all PPE is good to go