Homes under construction lots 86-91, 77, 60-65 Trades on-site: Lot 65 Villalobos Framing Lots 91 & 64 Parker Concrete Lot 77 America\'s First Roofing Lot 61 MacAdams flooring Lot 61,62,92, Chris Corey Excavation Lot 62 had to re-install temporary handrails Lot 77 had one upstairs window brace installed on the outside instead of the inside (now fixed)