Lot 26 I was out doing my safety walk came up to lot 26 painters were in there prepping to paint. Everybody had personal protective equipment that\'s required. Lot 25 out walking my site came up to lot 25. No one working at this home at this time. Lot 24 I was out walking my site came up to lot 24 framers were landing trusses. Everyone had on their fall protection and personal protective equipment on. Lot 22 I was not doing my watch. Came up to lock 22. No one working at this home at this time. Lot 80 I was out doing my safety walk came up to lot 80 the siding company was working and they all had their paw protection on and their personal protective equipment on. Also electricians working at the same lot. They had all their personal protective equipment on as well and the fireplace installers were also working at this home and they also have all the personal protective equipment on that required. Lot 80 I came up to Lot 80 foundation guys had everything set up. Everybody had their personal protective equipment on. Lot 79 out doing my safety walk came up to lot 79 foundation guys were setting up foundation. Everyone had the personal protective equipment on. Lot 78 I was out walking my site came up to lot 78 trim carpenter was in here working. He had his personal protective equipment on as required chopsaw hat guard on it also.