Lots 99/100 morcrete pouring garages porches PPE is good just doing finish trowel Lot 101 RNR builders framing second floor , I\'ve stopped second floor framing immediately and put the crew on framing the staircase before standing any walls all PPE and ladders in proper use. Lot 102 morcrete construction exposing aggregate driveway gloves boots and general PPE is properly used Lot 106 westside drywall blowing wall insulation masks gloves body suits all PPE and ladders look to be properly used Lot 108 three phase electrical pulling rough in wire PPE ladders in good proper use. Chords and wire off ground ran overhead Lot 109 grandview landscaping laying bark for final erosion stabilization and landscape PPE in good proper use Lot 113 three phase electrical doing finish trims ladders gloves general PPE looks to be in proper use.