Lots 222 through 219 there are framers doing floor prep with planners using masks and glasses and there is hard surface is being installed in 221 for installer has guards on all of his sauces and is using eye protection. Floor installer does not have vacuums attached to his saws. Lots 2/15 or 218 nobody\'s working in there sheet rockers are not working in there today. Performance is coming by and servicing all of their dragons and that is all going on there. Lots 214 through 211 framers are starting second floor construction, and no stairways are installed yet. I will be letting them know all Hart hats and safety vests are being worn Lots 226 through 223. There is sheet rock hangers in there using proper PPE being safe. All ladders are properly braced and opened up all the way.