Lots 219-222 There is a finish carpenter in 219 saw has guard and vacuum is attached. Glasses are being worn and hearing protection is in. Floor installer is in lot 222 finishing up lvt upstairs and ppe is being worn Lots 223 Siders are installing windows from inside so no pump jacks are needed Lots 214-211 framers are doing second floor construction and they installed stairs for second floor construction. The upstairs is guard railed and safe Lots 195-198 Excavation is finished so no excavation is being performed. Site is cleaned and proper housekeeping is being practiced