Lot 114 concrete guys just poured the garage slab. They\'re just using a hose and hand tools. No hazards found at this time Lot 116 concrete guys are just washing off their tools as They have completed garage pour no hazards found at this time. Lot 120 Sider are wrapping up siding install all of their ladders are at a four to one angle and extend 3 feet past the roof line pump. Jack have proper footing are leveled and have proper fall protection. fall protection work plan is present. Cut guy is wearing his hardhat. He has the vacuum out and is currently using it while cutting the guy above nailing has eye protection on fall protection work plan is present. Their chords are free of splices no hazards found at this time. Lot 76 painters are currently doing final paint touchup. They had a heater out, warming up the garage door and I ensure that they had somebody attending to it at all times and also had a fire extinguisher present. Everything that they are doing is on the inside, aside from garage door and entry door And they are using extension poles no ladders being used at this time. No hazards found Lot 78 framers are currently starting second floor. The stairway is built. There are guard rails around the perimeter and their fall protection. Work plan is present. Everybody\'s wearing work boots I protection they are using battery operated tools no extension cords at this moment no hazard found at this time. Lot 8 cabinet installer is currently setting up. I confirmed he will be wearing eye protection and the table saw that he has out has a table guard on it. No hazards found at this time. Lot 10 framers are currently setting up trusses. They are all tied off fall protection. Work plan is present no hazards found at this time.