Lot 268_Zweigart siding, are working on exterior siding, personal fall protection plan is posted and filled out all PPE is good to go Lad 242_Sunlight Electric day one of Rough in all PPE is good to go Lot 269_Westside Drywall\'s scrapping truck is just cleaning up excess drywall inside the house. All PPE is good to go. Lot 241 EK Plumbing doing post and beam, all PPE is good to go Lot 286_Mendez Concrete just starting on setting up forms for Foundation. All PPE is good to go. Lot 284_ Zweigart siding, installing exterior siding, fall protection plan is posted and all PPE is good to go Lot 283_ Morcrete is finishing up driveway and front porch walkway, all PPE is good to go Lot 282_ carpentry) doing an interior trim, all PPE is good to go Lot 281_ Envision Flooring has tile guy finishing up backsplash and fireplace. All PPE is good to go. Lot 281 Suburban Door delivering interior millwork all PPE is good to go Lots 272 and 271_ framers are finishing up second floor walls and getting ready to roll out trusses. We are missing safety rails on second story windows, and on stairs inside the home spoke with Serge to make sure they get that in by the end of the day. Lot 273_You And I construction, installing mirrors, shelving and bath accessories. All PPE is good to go. Lot 274 Ferguson Appliances delivering appliance package, all PPE is good to go Lot 276_West Side insulation has text fixing air leakage areas for Blower Door. All PPE is good to go.