PVV 476-477-478-479 trusses are being sad. Today there are three people up in the trusses each of them tied off at a different Anchorage point. Installing Outlook or\'s and overhang ply. Six people are working total all of them have hardhat, safety glasses, safety vest, and appropriate work attire. The chords are like into GFCI three-way. One cord had a Nick and it am I asked him to replace. I also asked the crew to tidy up and clean up the second floor as it was very hard to walk around with things everywhere. Everyone was working safely at a good pace and both crews seemed to be working carefully and methodically. PVV480-481-482-483 I have open trenches in the trenches were deep open for utilities to be installed. Utilities were located. To track hoes were working. Along with two pipe installers. The trenches were less than 3 feet deep when I observed mainly they were working on rain drains. WOLCOTT plumbing for two colors on site. They had safety glasses on with hearing protection. They were working in the garage is running the low points from the back of the garage to the alleyway inlet. The plumbers were using a GFCI plug. Their cords were good, and they had appropriate work attire on.. Tier 1 guys had visibility, neon yellow work sweatshirts with appropriate work attire. PVV 691 siding Works was wrapping up the install on this building and pulling off their pumps. They were moving from 691 to 690 Each of them had appropriate work attire on hardhat, safety glasses, gloves, boots, and sit safety vest at 690.They had tied off at three anchor points on the north side. Two guys were up on the upper floor on the pump, jacks and one guy was out on the front of the home second-story. The electricians were in 690 installing wiring and they were both working off of 6 foot ladders. They both were working safely and had appropriate PPE. I asked them to put on safety glasses when they were drilling holes. PVV 692 electricians are working on trimming out and finishing this home. All the electricians were dressed appropriately and had direct PPE. They were using good ladders, 8 foot and 6 foot ladders.. good job cleaning, and sweeping out the house when they were done and worked safely and cleaned everything. PVV 701 plumbing crew was working on the underfloors. They were using GFCI plug and good cords and were working safely in the post and beam when I witnessed there was two. And they cleaned and made sure things were tidy. PVV 704 the framing crew was setting second-floor walls. They were removing safety rails on the outside after all the exterior walls were set and installing interior walls. All of the safety PPE was being worn from hardhats to gloves, I protection hearing protection, and they had safety vest on all his high viz.. GFCI used and cords we\'re New. Safety rails installed up the stairs. And also all second-floor windows railings were installed. PVV 699 second floor joists were being rolled. I should say floor trusses were being installed in place. Safety rails were all installed around the home. The framers were using ladders to install all of the floor system and we\'re working safely. They all had hardhats two guys that were nailing were using safety glasses and we\'re in good appropriate PPE. They had a visibility safety vests on or good color shirts and jackets.. the one crewmember cutting was using earplugs, as well as safety, glasses and doing a good job