Lot 113 currently has excavators doing backfill on utility trenches most of the work is completed and they are simply smoothing out the grade. They also have a truck shooting rock into the crawlspace no hazards found at this time. Lot 116 framers are currently installing trusses. They have one 1 extension ladder out. It is at a 4 to 1 angle. It is not damaged and it extends 3 feet past the roof line to gain safe access fall protection work plan was present but was extremely wet and a little bit torn, so I gave him a new one and asked him to please fill it out, which they obliged One of the guys that was using a nail gun, had the glasses on his forehead, but did not have the nail gun in his hand, and I confirmed that he would put them back on prior to using the nail gun no hazards found at this time Lot 120 I have kitchen slab installers currently installing quartz. They are using denature alcohol to clean everything and are wearing gloves and respirators as to not inhale fumes no hazard found at this time. Lot 13 framers are currently doing post and beam. They\'re currently using a Skil saw. The guard is on their extension. Cord is free of spices no hazards found at this time. Lot 12 roofers are currently wrapping up install fall protection work plan is present. They have their harness on and are actively tied off their ladder extends 3 feet past roof line. They are wearing hardhat and proper PPE and they have the area taped off as to not have people working underneath them no hazards found at this time . Lot 10 currently has Sider installing WRB they\'re wrapping up the first floor they have their fall protection, work plan, and are now cleaning up wrapping up their day no hazard sound at this time Lot nine electricians are currently doing rough electrical. They are simply using power tools like impact drivers and headlamps. They have one A-frame out which is in good condition, no cracks and is of adequate height for the task at hand no hazards found this time