Lot 274 HVAC is working in here it\'s hvac rough. Everyone safe Lot 275 plumbing is going in. Extension cords have ground pens and plumbers are being safe. Lot 282 Carpenter is using eye protection while installing knob out Call 285 framing is going on but there is no fall protection working on second story Lot 287. Excavation is going on everyone\'s being safe. No trenching is being performed. There\'s one ground Guy and one excavator operator. Lot 219 blower door is being done by performance and everyone everyone\'s being safe Lot 191 grout, touchup, and paint touchup are being performed and is staying safe