Lot 276_TURBO PAINTING just doing paint touchups for punchlist walk-through. All PPE was good to go. Lot 272_Zweigart Siding installing exterior siding around home, all PPE is good to go Lot 242_Sunlight Electric finishing up rough in all PPE is good to go Lot 284 cabinet guys installing cabinets, LPPE is good to go Lot 285_framers working on framing pick up couple things that were noticed is the angle of the ladders that they were going up and down were a little too steep. We educated the workers and the owner surge. Make sure everything was good before we left other than that all PPE was good to go. Lot 241_Americas 1st Roofing, installing roof shingles, fall protection plan is posted and filled out properly. All PPE is good to go. Lot 241_(superior carpentry) installing exterior doors, one installer, not wearing hardhat while it stolen the door while roofers were overhead stopped work. Make sure the installer got his hard head on before work started up again. Lot 270 Ferguson\'s on site installing appliances. All PPE is good to go. Lot 243_Sider are installing building wrap all PPE is good to go Lot 243_Americas 1st Roofing installing roof shingles LPPE is good to go