Lot 272 PPE is accounted for ciders have fall protection work plan in place ladders are set up appropriately, however, they were corrected because they were carrying equipment up and down the ladders. Lot 285 framer is using a frame ladder incorrectly. It\'s leaned up against the side of the house which it can be because it has the rubber pads at the top, but it\'s not set up at the appropriate angle. Lot 241 roofers are tied down and all proper PPE is being worn, Carpenter has been warned to put his hardhat on. There is no gutters and there is roofers working overhead, so hardhats need to be worn. Lot 243 siders have fall protection workplace plan on the inside of the garage. They are tied down on the roof and their ladder access is extending above 3 feet past the edge of the roof. All PPE is accounted for. 266 and 267 to trenching has been performed for electrical and gas conduits and gutter water piping benching was not performed properly at a one oh one slope. It\'s more like a 2 to 5 slope. Drew is not out here to correct the problem lot is not being worked on. Lots 211 through 214 there\'s no staircase rail has been talked about and framer is correcting on the spot Lots 195 through 198. Drew Excavating was not wearing high viz T-shirts while working. Oleg told them to put some vests on.