PVV lot or 698 is receiving trusses. Today we have the road completely blocked off and were using construction triangles with flashers to block the road as the trusses are oversized. The safety crew is wearing fall, harnesses safety, glasses, hardhats, and appropriate PPE. Long sleeves gloves, boots jeans all of the crewmembers are working safely. They have safety measures in place for gable trusses and are working off of ladders to place the trust packages on the top walls. They are using the GFCI whip and splitters the compressors and hoses seem to be good and safe. All their safety equipment looks good hoses and cords are fairly clean and reasonably kept going through the garage. There is no safety hazards at this time rails are installed at window locations and up the staircase PVV lot 700 is first floor. Framing. There are two workers working with high viz. ability shirts on boots, jeans, sweatshirts. They are using glasses for working with the nail guns. They have their GFCI at the temporary power. The floor deck is clean and tidy hoses and cords are ran outside the foundation and garage. The saws have the blade guards installed correctly. PVVLot 701. Roofers are on site, both wearing high viz. ability, sweatshirts fall harnesses, and they have their harnesses tied off with the appropriate amount of slack on the lines. The extension ladder is extended 3 feet beyond the roofline and tied off the ladders in good condition, and the feet are set appropriately. Both of the workers have safety glasses on kneepads and are working safely at this time PVV Lot 700 to the drywall cleaning crew is here sweeping out the garage at this time no safety violations noted . PVV Lot 705. Plumbers are installing a underfloors. Everything looks in good order. plumbers installed GFCI interrupter when asked to do so. PVV 704 electricians have glasses on and are working safely with all appropriate PPE. I asked them to make sure they stay off the top of their ladders. GFCI is installed at the 10th power. They are mainly working with battery powered tools and they all appear to be in good working order with their safety guards installed PVV 703 siding works is installing siding on this house. They have her vacuum attached to their sauce and they are working safely on the ground. The two cut men have glasses and hearing protection. The cat man has his mask hardhat they all seem to have the appropriate PPE their hoses and cords are nicely stowed on the left side of the house. they have GFCI protection at the 10th power. All of them seem to be wearing the correct PPE. Scaffolding is installed correctly on the right side of the home, and all the bases are sad supposed to appear to be plum, and the planks are tied up with chains. PVV 690 taping crew is using stilts they appear to have the right straps and harnesses on. They are working safely. The flatwork crew is here pouring driveways and everything seems to be coming together safely on this one this morning. PVV 691 excavation crew is back filling final grade. He\'s working safely at this moment.